Structure:
Flooring:
Wall Finishing:
Doors:
Windows:
Toilets:
Kitchen:
Electrical: |
Designed for seismic consideration for ZONE IV as per code IS 1893, Year 2002.
Marble/Vitrified Tiles in all the Rooms, Anti Skid Tiles in Kitchen and Bathrooms.
Oil Bound Distemper in pleasing shades.
Hard Wood / Steel Frame for Doors. Painted / Polished Flush Shutters.
Powder Coated / Steel Sections / Anodized Aluminium Glazing.
Vitreous Ceramic ware for wash basins & EWC. Quality CP Fittings.Walls in ceramic
glazed tiles upto Roof Height.
Granite working top. Stainless Steel Sink. Tile Dado upto 2' over counter.
Superior quality Copper wiring, switches with adequate number of points for lights
and fans. PVC recessed conduiting with TV and Telephone points.
|